Practical guidance on turbine overhauls, generator maintenance, plant audits and rotating equipment from the Axiom Power Services engineering team.
How back pressure and condensing steam turbines differ on power per tonne of steam, cooling water and capex, with indicative Naira costs for Nigerian plants.
Read Article → GeneratorsWhat a diesel generator really costs per kWh in Nigeria: fuel, loading, maintenance and overhaul reserve broken down in naira, with worked plant figures.
Read Article → GeneratorsWhat a generator maintenance contract in Nigeria must contain: scope by running hours, response times, spares lead times, load bank testing and penalty clauses.
Read Article → TurbinesTurbine overhaul or replace? Compare capex, outage days, fuel burn and spares over a ten year horizon in NGN, with figures Nigerian plant managers can test.
Read Article →